by phone, email, road, rail, air - with maps technical papers and brochures services, technologies and processes, people, examples Proneta’s most important asset events that Proneta is attending our lifeblood outside Proneta
Imaging
Through
Crude Oil
Reliability/
Risk Analysis
European
Projects
Intelligent Well Reliability Group

The Results (of RMA)

The results are in the form of a top-down analysis and comparison of the failure modes, effects and criticalities of the candidate systems, with recommendations for improved reliability.
The analysis results are suitable for use -
by an equipment manufacturer as a marketing tool and as an engineering management too
by an operator, for incorporation into a Well Feasibility Study, to assist in the overall evaluation of the field development options

The calculated risk values for all the elements of each of the options are examined in detail from various points of view, to provide the required comparisons, and to highlight the critical aspects driving the risk in each option.

The results indicate which potential failures dominate the risks in the different options, and which are in the next lower level of contribution. From those results, we are able to provide recommendations on the best mitigating measures to reduce the risks in the different options, and provide comparisons of the “before-and-after” risk profiles of the options.

We are also able to compare the breakdown of risks into different cost categories, such as intervention costs, deferment costs and loss of reserves.

The conclusions of the analysis present the reliability risks, from all phases of the project, in a quantitative way that enables an operator to compare them in financial terms directly with development costs and predicted returns.

More about RMA...
Overview / The Technique / The Benefits

Sussex Innovation Centre, Science Park Square, Brighton, UK BN1 9SB | Tel :+44 1273 234640 | Fax: + 44 1273 565 919 |